Improve testing and try to fix MySQL hanging (#32515)

By some CI fine tunes (`run tests`), SQLite & MSSQL could complete
in about 12~13 minutes (before > 14), MySQL could complete in 18 minutes
(before: about 23 or even > 30)

Major changes:

1. use tmpfs for MySQL storage
1. run `make test-mysql` instead of `make integration-test-coverage`
because the code coverage is not really used at the moment.
1. refactor testlogger to make it more reliable and be able to report
stuck stacktrace
1. do not requeue failed items when a queue is being flushed (failed
items would keep failing and make flush uncompleted)
1. reduce the file sizes for testing
1. use math ChaCha20 random data instead of crypot/rand (for testing
purpose only)
1. no need to `DeleteRepository` in `TestLinguist`
1. other related refactoring to make code easier to maintain
This commit is contained in:
wxiaoguang
2024-11-15 23:45:07 +08:00
committed by GitHub
parent a0c0cb3a2c
commit ecbb03dc6d
15 changed files with 201 additions and 246 deletions

View File

@@ -99,18 +99,8 @@ We appreciate that some testing machines may not be very powerful and
the default timeouts for declaring a slow test or a slow clean-up flush
may not be appropriate.
You can either:
* Within the test ini file set the following section:
```ini
[integration-tests]
SLOW_TEST = 10s ; 10s is the default value
SLOW_FLUSH = 5S ; 5s is the default value
```
* Set the following environment variables:
You can set the following environment variables:
```bash
GITEA_SLOW_TEST_TIME="10s" GITEA_SLOW_FLUSH_TIME="5s" make test-sqlite
GITEA_TEST_SLOW_RUN="10s" GITEA_TEST_SLOW_FLUSH="1s" make test-sqlite
```